Access the Full Project by Clicking here!
Bidjugde
JOB
North Parking Lot Repaving Prescott Resort Buckys Casino
BID DATE
03/9/18 - 1:00
AGENCY
Yavapai Prescott Indian Tribe
ESTIMATE
n/a
SCOPE
Parking Lot Asphalt Paving: Provide for the complete removal of the existing asphalt paving in the designated area as shown on the paving site plan. The existing base shall be compacted to 95%. Replace with new asphalt paving throughout the existing north parking lot. Required pavement sections are detailed in the construction documents. All edges shall be grinded to match adjacent existing pavement. All existing utility structures within the area of work shall be raised to match the finish grade. Parking lot will be restriped accordingly. Existing islands will remain as is. The existing light poles and irrigation system are active and in working order and will remain so during and after completion of the project. All waste materials / spoils to be removed off site. Refer to attached Paving Site Plan for additional information related to scope of work not addressed herein. Alternate No 1: Provide for the removal of existing curbing where indicated and replace with new 6" vertical curbing per MAG Detail 222. Refer to paving site plan for locations. Diana Rios, Planning Department Administrator, drios@ypit.com. Questions regarding the RFP are to be emailed to John Dominguez, Construction Project Manager, jdominguez@ypit.com swiley@ypit.com
PREBID
3/1/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT