Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 3A Composite Liner Savage Canyon Landfill
BID DATE
03/13/18 - 10:00
AGENCY
Whittier
ESTIMATE
n/a
SCOPE
The work generally involves the construction of the Phase 3A lined landfill cell at the Savage Canyon Landfill. The work to be performed consist of mass excavation, earthwork, installation of high density polyethylene (HDPE) geomembrane, geosynthetic clay liner (GCL), geocomposite, geotextiles, HDPE and corrugated polyethylene (CPE) piping, and surface water control structures. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project. In general, this work includes, but is not limited to, the following: ï‚· Miscellaneous unclassified excavation. ï‚· Miscellaneous unclassified fill placement. ï‚· Installation of subdrainage systems. ï‚· Construction of compacted low-permeability soil layer. ï‚· Installation of geosynthetic clay liner, HDPE geomembrane, and gravel LCRS drains. ï‚· Placement of protective soil cover ï‚· Pavement of access roads ï‚· Construction of miscellaneous civil and surface-water control improvements
PREBID
2/28/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT