Paris 2017 Resurfacing (REBID)
BID DATE
05/10/18 - 2:00
AGENCY
Redlands
ESTIMATE
$5,500,000
SCOPE
ORG RESULTS: All American Asphalt - $8,417,859 Matich Corp - $8,688,800 RJ Noble - $9,375,320 EBS General Engineering - $11,487,398 The scope of work consists of resurfacing various streets throughout the City. Resurfacing methods include pulverization, grind & overlay, header cut & overlay, and slurry seal (type II). Asphalt overlay will be the conventional asphalt. All necessary striping will be replaced. The scope of work also includes removal and replacement of curb & gutter, and cross gutter as necessary; replacing water services with meter box; protecting in place all existing utilities, trees, and public and private improvements; pavement striping and restriping; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Goutam Dobey - 909-798-7584 x2 gdobey@cityofredlands.org
UPDATES