Access the Full Project by Clicking here!
Bidjugde
JOB
2017 CIP Water Pipeline Replacement
BID DATE
02/28/18 - 2:00
AGENCY
Redlands
ESTIMATE
$3,775,000
SCOPE
The scope of work for this project is the installation of approximately 110 linear feet of 6" DIP water pipeline, 24,845 linear feet of 8” DIP water pipeline and 175 linear feet of 12" DIP water pipeline. The work shall consist of all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork; compacting; furnishing and installing all pipe, fittings, and appurtenances; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Patrick Safari - 909-798-7584 x9 psafari@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT