Access the Full Project by Clicking here!
Bidjugde
JOB
Measure J Community Sidewalk Gap Closure Improvements
BID DATE
03/8/18 - 3:00
AGENCY
Palm Springs
ESTIMATE
$1,537,000
SCOPE
The Work comprises installation of missing sidewalks and other items of work at Alejo Road, Amado Road, Baristo Road, Camino Real, Farrell Drive, E Palm Canyon Drive, N Indian Canyon Drive, Racquet Club Road, Saturmino Drive and Sunny Dunes Road in the City of Palm Springs including: surveying and monument control (corner records), and recording, preservation and resetting of existing survey monuments; removal of existing asphalt concrete pavement; unclassified excavation; preparation of subgrade; asphalt concrete paving; removal and replacement or installation of concrete curb and gutter, sidewalks, driveways, cross gutter/spandrel, curb ramps and installation of truncated domes; adjustment of sewer manholes and water valves to grade; traffic striping, signage and markings; and traffic signal modification and all other appurtenant work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT