Access the Full Project by Clicking here!
Bidjugde
JOB
Edison Language Academy Safe Routes School
BID DATE
03/8/18 - 2:30
AGENCY
Santa Monica
ESTIMATE
$530,000
SCOPE
The Work essentially includes but is not limited to traffic control; surveying and preparation of cut sheets, cross sections and construction staking for construction of various project elements; clearing and grubbing; excavating, removing and disposing of excess roots, soils, base material, asphalt and concrete pavement, and damaged concrete improvements; placing & compacting crushed miscellaneous base; construction of concrete curbs, gutters, sidewalks, curb ramps; asphalt skin patching; asphalt & concrete cold-milling and asphalt overlay with Asphalt Rubber Hot Mix (ARHM) on various streets as indicated on the plans; adjusting to grade maintenance hole frame and covers, water valve risers, water meter boxes, pull boxes and traffic signal boxes; placement of various types of paint & thermoplastic striping; placement of pavement markers; new landscaping and irrigation; and various other appurtenant work. Temporary Traffic Control Plans (TTCP) submitted by the Contractor shall be prepared by a California registered civil or traffic engineer and approved by the Transportation Management Division prior to start of this work. Joshua Carvalho joshua.carvalho@smgov.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT