Access the Full Project by Clicking here!
Bidjugde
JOB
SGVMWD Interconnect Site Improvements
BID DATE
03/1/18 - 10:00
AGENCY
Azusa
ESTIMATE
n/a
SCOPE
The work consists of the construction of an interconnection pipeline including approximately 22 linear feet of 18- inch Class 350 pipe, 14-inch and 18-inch schedule 40 cement mortar lined and coated steel pipe, weld all joints; this work includes valves, connections, abandonments, appurtenances, pavement replacement, grading, and traffic control and all supplies, equipment, shoring; a 14-inch pressure reducing and flow control station, a 14-inch meter and station, 250 psi rated 14-inch, 18-inch, and 24-inch butterfly valves, 250 psi rated air release vacuum valve assemblies, a vault for raw/potable systems disconnect, an overflow structure modification, epoxy coating and painting all above ground piping, SCADA, SCADA integration for ALW and SGVMWD, electrical work, supplies, services and transportation necessary mbarbosa@ci.azusa.ca.us
PREBID
2/21/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT