North Bay Regional Water Treatment Plant Site Piping Valves Vaults Improvements
BID DATE
02/27/18 - 2:00
AGENCY
Fairfield
ESTIMATE
n/a
SCOPE
This Project includes, but is not limited to, furnishing and installing new treated water vaults, new raw water vault, new valves, 16-inch washwater return piping, sump pumps, sump drain piping, electrical conduit, electrical panels, and controls. All equipment shall be installed in accordance with the manufacturer's requirements and recommendations. The Contract includes any other work as shown on the Project Plans, as specified in the Contract Documents, and as directed by the City Engineer. Note: All construction work will actually occur within the North Bay Regional Water Treatment Plant.
PREBID
2/1/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT