Access the Full Project by Clicking here!
Bidjugde
JOB
WPCF Pond 7 Biosolids Drying Removal
BID DATE
03/22/18 - 3:00
AGENCY
Woodland
ESTIMATE
$500,000
SCOPE
The Drying and removal of biosolids from the City's Water Pollution Control Facility (WPCF) Pond 7. Pond 7 is approximately 11 acres and has on average 3-4 feet of accumulated material. The material is to be dried and removed to the landfill. An optional pre-bid site walk is scheduled for 9am, March 1st, 2018 at WPCF, 42929 CR 24, Woodland, CA 95776 A pre-project meeting is scheduled for Mar 1, 2018 - 10:00 am Matt.Cohen@cityofwoodland.org
UPDATES