JOB
Phase 1 Arden Way Mainline Extension Replacement
BID DATE
03/15/18 - 10:00
AGENCY
Carmichael WD
ESTIMATE
$300,000
SCOPE
The Carmichael Water District Arden Way Mainline Extension/Rehabilitation Project is located along Arden Way between House Works Drive and McClaren Drive. The work includes the installation of approximately 2,100-feet of new 8-inch diameter Class 52 ductile iron water main within the Arden Way right-of-way, twelve (12) 8-inch gate valves, three (3) fire hydrant assemblies, one (1) 2-inch air release valve, four (4) 1-inch water services to existing meter boxes, three (3) connections to existing water main, and other appurtenances and the restoration of existing surfaces and property. Bidding Documents are available for purchase through Signature Reprographics for a non-refundable fee of $30.00 for half sized plans and specifications ($55.00 w/CD) and $40.00 for full size plans and specifications ($65.00 w/CD), plus shipping and handling. Contact Debbie Marquez at 916-454-0800 or via e-mail (dmarquez@signaturerepro.com ). Plans and specifications can also be provided electronically (PDF format) for a non-refundable fee of $30.00 per set. All bidders must purchase a complete set of the documents (hard copy or complete download) from Signature Reprographics to be considered responsive and to receive subsequent communications such as addenda. Bidders must be listed on the planholder’s list to receive addenda and to be eligible to submit bid. This is a public works project funded by state and local funds. Engineer: https://www.westyost.com/
PREBID
2/27/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT