Access the Full Project by Clicking here!
Bidjugde
JOB
Senior Parking Lot Handicap Ramps Sidewalk 2018
BID DATE
03/5/18 - 12:00
AGENCY
Ripon
ESTIMATE
$200,000
SCOPE
The work in general consists of constructing new handicap ramp returns and sidewalk in an older residential area, and a school zone in Ripon. Related work items shall be but are not limited to: asphalt removal, concrete removal, tree removal, asphalt paving, pavement striping, landscape restoration, catch basin installation/adjustment, fire hydrant installation/adjustment, fence removal and replacement, pot-hole existing utilities and sign relocation. The project also includes the application of a type II slurry seal at the Ripon Senior Center Parking Lot. Preparation of the asphalt surface includes repairing any damage asphalt, removing striping, removing vegetation in cracks and crack filling prior to the slurry seal application and pavement striping.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT