Access the Full Project by Clicking here!
Bidjugde
JOB
Hitchcock Way Interceptor
BID DATE
03/7/18 - 3:00
AGENCY
Santa Barbara
ESTIMATE
n/a
SCOPE
This project will entail the installation of about 330 linear feet of 12" diameter PVC sewer pipeline from the intersection of state street and hitchcock way, southerly to an existing manhole. The existing manhole will be replaced to meet current design standards. Philip Maldonado City of Santa Barbara Engineering / Public Works 630 Garden Street Santa Barbara, CA 93101 Tel:(805) 560-7544 Fax:(805) 897-1991 pmaldonado@santabarbaraca.gov
PREBID
2/20/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT