Access the Full Project by Clicking here!
Bidjugde
JOB
Sun City Street Resurfacing
BID DATE
03/1/18 - 3:00
AGENCY
Menifee
ESTIMATE
$440,000
SCOPE
1. Remove all existing thermoplastic striping and raised pavement markers within the work area. 2. Grind and overlay 2” AC as shown in Exhibit C 3. Sawcut and properly remove and dispose existing concrete pedestrian ramps, curb and gutter and cross gutter were shown. 4. Install ADA compliant pedestrian ramps prior to street resurfacing. 5. Crack fill large traverse cracks as needed. 6. Apply a 5/16” aggregate (chips) over a Polymer Modified Rejuvenator Emulsion (PMRE) scrub seal where shown in Exhibit B – Project Detail Map. 7. Apply Type II slurry seal over the entire work area. 8. Re-stripe existing road as shown in Exhibit B – Project Detail Map, all striping and pavement marking shall be thermoplastic. 9. Install blue dots at the location of all existing fire hydrants.
PREBID
2/22/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT