Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Pavement Improvements
BID DATE
02/21/18 - 2:00
AGENCY
Chula Vista
ESTIMATE
$445,630
SCOPE
The Sidewalk and Pavement Improvements at City Parks Project includes the dig out and replacement of 4" and 6" AC pavement sections with full depth AC, adjusting utility valves to grade, preparation and cleaning of AC pavement and application of double coat of "GuardTop" Seal Coat, replacement of existing sidewalks with new 4" Sidewalk and root barrier as directed, 6" Curb and Gutter, 6" Curb with Sika Compound or approved equal, 3' wide ribbon gutter, signage and pavement markings, the placement of concrete wheel stops, removing and resetting existing concrete pavers, replacement of an existing concrete pad, and the installation of a new ADA Compliant Picnic Bench to the satisfaction of The Public Works Manager. Silvia Cosio - 619-397-6048 scosio@chulavistaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT