JOB
Magnolia Force Main Relocation
BID DATE
03/29/18 - 2:00
AGENCY
Healdsburg
ESTIMATE
n/a
SCOPE
The Work in general consists of the relocation of 1,600 linear feet of 14-inch sanitary sewer force main across Dry Creek near Magnolia Lift Station at 1026 Magnolia Drive, Healdsburg. The Project will install approximately 1) 1,800 linear feet of new 16-inch fusible PVC force main; 2) 500 linear feet of new 14-inch fusible PVC force main; 3) ten (10) 16-inch plug valves; 4) 12 manhole structures; 5) two (2) bypass/flushing connections with valves; 6) four (4) tie-ins to the existing force mains; 7) all other pipeline elements, fittings, hydrostatic testing, and other such items of work as required to complete and operate the new force mains in accordance with this Contract, the Project Plans and Technical Specifications. The new force mains will be installed using standard open trench techniques and trenchless techniques consisting of a 305-foot-long microtunnel. Patrick Fuss, Principal Engineer pfuss@ci.healdsburg.ca.us
UPDATES