Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drain System Repair Rehabilitation
BID DATE
02/7/18 - 10:00
AGENCY
Newport Beach
ESTIMATE
$635,000
SCOPE
The work necessary for the completion of this contract consists of(1) distributing construction notices to affected businesses and residents; (2) cleaning,inspecting and CCTV recording the storm drain lines; (3) lining of existing CorrugatedMetal Pipe (CMP); (4) potholing and exposing existing storm drain lines and utilities; (5)trench excavating and replacing pipe sections; (6) installing a Polyvinyl Chloride (PVC)storm drain; (7) resurfacing trenches in the roadway and/or parkway, including installingpavement striping and markers; (8) enlarging pipe connections at two existing catchbasins; (9) grouting and filling voids within existing CMP; and (10) all other incidentalitems of work as described in the Contract Documents.” Kathryne Cho - 949-644-3014 kcho@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT