Vista Way El Camino Real Sewer Relocation
BID DATE
02/22/18 - 2:00
AGENCY
Oceanside
ESTIMATE
$160,000
SCOPE
The work shall be performed during the hours between 9:00 PM and 5:30 AM only, and shall consist of installing approximately 57 LF of New 8 inch diameter SDR 26 PVC Sewer, New 5 foot diameter Manhole at the depth shown on the plans according to contract drawing and specifications and abandon existing 80 LF of 6 inch diameter VCP sewer line utilizing low density grout (500 psi) Shukri Sharabi City of Oceanside Water Utilities 300 N Coast Hwy Oceanside, CA 92054 Tel:(760) 435-5809 Fax:(760) 435-5821 ssharabi@ci.oceanside.ca.us