Access the Full Project by Clicking here!
Bidjugde
JOB
Irrigation Lateral Improvement Phase II
BID DATE
02/15/18 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$4,000,000
SCOPE
The work includes furnishing all labor, tools, materials, and equipment necessary to: Replacement of approximately 6,605 linear feet of 33 and 36-inch diameter reinforced concrete pipeline with 42-inch diameter C905 PVC pipeline. From Station 60+14 to Station 126+17; locating and disposing of the temporary PVC to RC pipe connection installed by the Phase 1 contractor. Installation of approximately 285 linear feet of 8-inch diameter C900 PVC pipeline for irrigation laterals; Connecting new Phase 2 pipe to Phase 1 installed 42” tee; Removal and disposal of reinforced construe pipe vent; Removal and disposal of 5 reinforced concrete baffle stands; Removal and replacement of 11 metered delivery points; Pipeline dewatering system; Temporary bypass pipeline; Potholing of all utility crossings; Construction survey and staking; Furnish and install one 42" plug valve and one 42" tee; Hydrostatic pressure testing; Startup and testing, and perform all appurtenant work including, but not limited to, incidentals, excavation, shoring, clearing and grubbing, grading, fencing and landscape restoration, and all other work required for a complete and operable system. Brian Korcok - 760-398-2651 x2510 bkorcok@cvwd.org
PREBID
2/1/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT