Access the Full Project by Clicking here!
Bidjugde
JOB
Lift Station No 7 Replacement
BID DATE
02/8/18 - 10:30
AGENCY
Alhambra
ESTIMATE
n/a
SCOPE
The work consists of providing labor, equipment, material, tools, safety and traffic control for the construction of a new duplex sliderail submersible sewer lift station with 29 HP, 750 gpm, 1750 RPM non-clog pumps; an identical spare pump to be delivered to the City Yard; 10 ft diameter, and 22.8 ft deep reinforced concrete, T-Lock lined wet well; a 7.5 ft wide. 5 ft long, and 8.5 ft deep reinforced concrete valve vault; a 5 ft wide, 5 ft long, and 8.3 ft deep reinforced concrete meter vault; removal of 72 LF of existing 10-inch VCP sewer; construction of 36 LF of 10-inch VCP sewer; construction of 49 LF of 8-inch VCP sewer; construction of 16 LF of 12-inch VCP sewer; construction of 31.4 LF of 12-inch VCP temporary sewer; construction of 19.4 LF of 12-inch VCP overflow sewer; construction of 2,952.4 LF of 10-inch diameter DR 14 AWWA C900 PVC forcemain in Sarazen Drive, Hathaway Avenue, Hellman Avenue, and Olive Avenue to Ramona Road North; construction of 412 LF of 10-inch diameter DR 14 AWWA C900 PVC forcemain in South Olive Avenue and Ramona Road South to Curtis Avenue and connecting to the existing 8- inch diameter cast iron forcemain; jacking and boring 259.4 LF of 18” diameter, minimum ½ inch thick steel casing under the I-10 Freeway and the Metrolink Railroad; jacking 261.4 LF of 10-inch diameter DR 14 AWWA C900 PVC carrier pipe; constructing approximately 121 LF of 8-inch and 6.4 LF of 6-inch Class 350, double thick cement mortar lined ductile iron pipe, fittings and valves to replace approximately 132 LF of existing 8-inch and 6-inch cast iron water pipe; removal of approximately 132 LF of existing 8 –inch and 6-inch diameter cast iron water pipes, relocation of other interfering utilities; bypass pumping and maintaining sewer flows throughout the construction; 125 KW, 480 V, 3 phase standby emergency generator; conduits, wires, power service, MCC, and pump control panel; radio telemetry; removing and properly disposing of the equipment and coatings from the existing lift station; modifications to the existing lift stations; and all appurtenant work. ksu@cityofalhambra.org
PREBID
1/17/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT