Access the Full Project by Clicking here!
Bidjugde
JOB
Quadrant II Water Main Replacements Various Locations Phase IIB
BID DATE
02/15/18 - 2:00
AGENCY
Chino
ESTIMATE
n/a
SCOPE
Water Main Pipe Replacement Construction which shall include trenching and permanent trench repair. Saw cutting of existing asphalt and concrete as per plan. Restoration and/or relocation of all construction affected improvements which can include but are not limited to sewer pipes, storm drain pipes, electrical conduits, cross gutter and other improvements as necessary to construct the water main pipes as per plan. Traffic control design and implementation along with the appropriate BMP's as per SWPPP required to be submitted. Lupe Camacho - 909-334-3406 lcamacho@cityofchino.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT