Access the Full Project by Clicking here!
Bidjugde
JOB
Pavement Maintenance 2018
BID DATE
02/27/18 - 3:00
AGENCY
Fairfield
ESTIMATE
n/a
SCOPE
Work is to include but not be limited to temporary construction signage and striping, traffic control, striping and pavement marking removal, and re-striping of AC paved areas in all project locations, accessible ADA ramps, crack sealing, adjusting manhole, valves and monuments to grade, pavement grinding, hot mix asphalt repair work (digouts) in preparation of the application of an asphalt rubber cape seal, comprised of an asphalt rubber chip seal covered by a slurry seal on identified roadways within the Waterman Highlands and Southbrook Subdivisions, the application of a Type III microsurface covered by a slurry seal on Calaveras Drive, the application of a slurry seal on identified roadways , and all other items or details not mentioned above that are required by the City of Fairfield Standard Specifications, or the Special Provisions, as specified in the Contract Documents, and as directed by the City Engineer.
UPDATES