Access the Full Project by Clicking here!
Bidjugde
JOB
Union Mine Disposal Site 2017 Storm Damage Repair
BID DATE
02/5/18 - 2:00
AGENCY
El Dorado County
ESTIMATE
$650,000
SCOPE
Construction Support Tasks, including providing construction support, surveys, and mitigation measures during Project construction; Earthwork Services, including clearing and grubbing, unclassified excavation and fill, waste removal and reconsolidation, and soil import and stockpile for the slope repair, including trimming refuse slopes to obtain a 2:1 or shallower gradient, and installation of drainage improvements to preserve fill and native slopes; Miscellaneous Civil Improvements, including installation of non-woven geotextile and construction of drainage improvements; and Asphalt Concrete Services, including cold milling of existing asphalt, saw-cutting, demolition, and removal of existing asphalt concrete and base material, and placement of base material, paving fabrics, and asphalt concrete that corresponds to the pavement sections. greg.stanton@edcgov.us
PREBID
1/16/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT