Access the Full Project by Clicking here!
Bidjugde
JOB
St Andrews Lift Station Shoreline Protection Pismo Beach
BID DATE
01/19/18 - 5:00
AGENCY
Department Army
ESTIMATE
$5,000,000
SCOPE
Project consists of construction services will consist of a sculpted reinforced concrete tied-back wall to protect a sewage lift station, the sewage line, the road, and a portion of Memory Park. The bluff protection will be approximately 150 ft. in length and 40 ft. in height. The bluff protection will closely follow the meandering bluff face, will include 2-ft thick tied-back shotcrete wall with architectural treatment to match the natural bluff, and will include an ADA compliant reinforced concrete staircase for access to the beach. The bluff protection footing will be embedded into the underlying bedrock, with an anchoring system to support the upper portion of the wall. Existing storm drains will be re-routed behind the tied-back wall. Weep holes will be included to provide drainage from the bluffs. The wall location is accessible by land. Patricia.B.Bonilla@usace.army.mil or Stanislav.Y.Sekacov@usace.army.mil.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT