5th Street Grant Avenue Water Main Improvements
BID DATE
01/3/18 - 2:00
AGENCY
Calexico
ESTIMATE
n/a
SCOPE
The work shall include the procurement of materials and the installation of a new 24 inch diameter water main pipeline to be connected to an existing 18 inch water line along 5th Street east of the existing Union Pacific Railroad tracks at STA 13+42. The scope of work also includes the installation of the 24 inch water main by way of jack and bore under the Southern Pacific Railroad tracks. The proposed 24 inch water main continues west along 5th Street, crosses the Union Pacific Railroad tracks and Cesar Chavez Blvd. At Cesar Chavez Blvd. existing fire hydrants and existing water lines will be connected to the new 24 inch water main. The 24 inch water main will continue west on 5th Street to Pierce Avenue and turn north to the City of Calexico Water Treatment Plant and connect to the existing 18 inch water line at the water plant at STA 26+20. The project will also include traffic control implementation and erosion control. The proposed 5th Street Water Main Improvements will be completed (constructed) in two (2) phases. Phase 1 is part of this project. Phase 2 is not part of this project and will be bid as a separate project.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT