Access the Full Project by Clicking here!
Bidjugde
JOB
Havasu Riviera Street Utility Improvement Plans
BID DATE
01/23/18 - 3:00
AGENCY
Lake Havasu
ESTIMATE
$4,506,207
SCOPE
Construction of a new 12” PVC DR-14 CL-305 transmission water main including the installation of valves, bends, air/vac valves and associated pipeline appurtenances and hot tap of existing 27” CCP water main. All major joints shall be mechanically restrained. Contractor is responsible for trench, trench prep, and backfill, pavement removal and replacement of all disturbed areas. Transmission water main will require jack & bore under State Route 95 at MP 179.553 with installation of 12” Class 350 DIP water main. 12” DR-14 CL-305 water transmission main from the southern side of Arizona State Route 95 (MP 179.553) to its termination at the future Havasu Riviera Arizona State Park property line with a second termination at the future Havasu Riviera residential community entrance. Construction is to include installation of valves, bends, air/vac valves and associated pipeline appurtenances including fire hydrants. All major joints shall be mechanically restrained. Drainage infrastructure, including catch basins and HDPE culverts at roadway crossings will be constructed. The installation of new 4” and 6” PVC C900 DR-18 force mains. Construction is to include installation of bends, air/vac valves, associated pipeline appurtenances, and manholes. All major joints shall be mechanically restrained. Subgrade preparation, aggregate base, asphaltic concrete, curb and gutter, single curb, sidewalk and handicapped ramps. purchasing@lhcaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT