Access the Full Project by Clicking here!
Bidjugde
JOB
Collection System Rehabilitation Replacement Pedro Point
BID DATE
02/5/18 - 2:00
AGENCY
Pacifica
ESTIMATE
$3,800,000
SCOPE
The project includes the replacement of approximately 912 LF of 10-inch VCP sanitary sewer mainline with new 12-inch HDPE pipe (SDR 17) by pipe bursting, replacement of approximately 14,157 LF of 6-inch VCP sanitary sewer mainline with new 8-inch HDPE pipe (SDR 17) by pipe bursting, replacement of approximately 45 LF of 6-inch VCP sanitary sewer mainline with new 8-inch HDPE pipe (SDR 17) by open trench, replacement of approximately 150 LF of 6-inch VCP sanitary sewer mainline with new 8-inch HDPE pipe (SDR 17) by open trench (does not include excavation and backfill), replacement of approximately 825 LF of 6-inch VCP sanitary sewer mainline with new 6-inch HDPE pipe (SDR 17) by pipe bursting and replacement of approximately 99 LF of 6-inch VCP sanitary sewer mainline with new 6-inch HDPE pipe (SDR 17) by open trench. The work includes replacing 29 LF of drop hole piping, rehabilitating 43 manholes as well as replacing 9 manholes and 31 lamp holes. garciaa@ci.pacifica.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT