Access the Full Project by Clicking here!
Bidjugde
JOB
Gateway Park Blvd Bridge Widening
BID DATE
01/17/18 - 2:00
AGENCY
Sacramento
ESTIMATE
$1,440,000
SCOPE
The proposed project consists of widening the Gateway Park Bridge to accommodate widening of Gateway Park Boulevard. The existing Gateway Park Bridge, which currently accommodates two lanes of traffic, would be expanded to four lanes of traffic with a median, bike lanes, and sidewalks. An existing concrete barrier and water utility line on the west side of the bridge would be removed as part of the project. The existing water utility line would be replaced with a new 12-inch water line on the western side of the bridge. Construction of the project would result in an increase in the total bridge width by 40-feet and three inches, to a total final width of 93 feet. The length of the bridge would remain unchanged with implementation of the proposed project. Ten 18-inch octagonal concrete pile-type piers and two abutments would be constructed to support the bridge expansion. In addition, a total of 0.09 acres of %-ton rock slope protection would be placed on both banks of the canal to stabilize the canal banks. Jose Ledesma JLedesma@cityofsacramento.org
PREBID
1/5/2018 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT