Access the Full Project by Clicking here!
Bidjugde
JOB
12th Avenue Sutterville Off Ramp Improvements Sacramento Route 99
BID DATE
12/20/17 - 2:00
AGENCY
Sacramento
ESTIMATE
$965,000
SCOPE
Work to be performed under these Special Provisions includes furnishing and installing all necessaryequipment and material to grade and pave to widen the southbound off-ramp from Route 99 to 12thAvenue in Sacramento, modify the traffic signals at the ramp terminal as shown on the project plans, and install a fiber optic line in 12th Avenue between the traffic signal controller at the Route 99 northbound ramp intersection with 12th Avenue and Franklin Boulevard. This work will include replacing drainage inlets and constructing grated line drains and constructing concrete barrier along the southbound off-ramp to 12th Avenue, replacing a sound wall access gate, and modifying existing freeway landscaping and irrigation facilities, and signing and pavement delineation. In addition, this contract includes providing and installing a traffic signal controller unit, which will be programmed by City of Sacramento forces. Jose Ledesma JLedesma@cityofsacramento.org
PREBID
12/12/2017 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT