Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide ADA Ramps Street Reconstruction Phase 6
BID DATE
01/16/18 - 2:00
AGENCY
Monterey
ESTIMATE
$1,500,000
SCOPE
In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach), curb ramps, storm drains, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction, full depth reclamation, and Hot Mix Asphalt paving. Rose Dickson City of Monterey Public Works/Engineering 601 Wave Street Ste 100 Monterey, CA 93940 Tel:(831) 646-3997 Fax:(831) 646-5686 dickson@monterey.org
UPDATES