Access the Full Project by Clicking here!
Bidjugde
JOB
Cycle 1 ATP Citywide SRTS Pedestrian Facility Improvements
BID DATE
01/18/18 - 5:00
AGENCY
Moreno Valley
ESTIMATE
$1,200,000
SCOPE
1. Dracaea Avenue at Burney Pass Drive: • Remove: existing dirt path, storm drain pipe and inlet, pavement and weeds.• Construct: new storm drain pipe, catch basin, curb and gutter, sidewalk, driveway approach, and pavement, striping, and solar radar speed feedback signs.2. Elsworth Street south of Dracaea Avenue:• Remove: existing dirt path and a section of chain link fence.• Construct: new curb and gutter, sidewalk, and pavement.3. Eucalyptus Avenue at Barbazon Drive:• Remove: existing asphalt concrete walk, storm drain pipe, inlets and pavement.• Construct: new storm drain pipe, catch basin, curb and gutter, sidewalk, driveway approach, pavement, and striping.4. Ironwood Avenue west of Kitching Street:• Remove: existing concrete driveway, block garden wall, asphalt concrete walk, storm drain inlet, traffic signal poles, and pavement.• Construct: new storm drain manhole, retaining wall and fence, curb and gutter, sidewalk, driveway approach, access ramp, traffic signal pole, solar radar speed feedback signs, pavement, and striping.5. Sandy Glade Avenue west of Davis Street:• Remove: dirt, pavement and weeds.• Relocate: vinyl fence• Construct: new curb and gutter, sidewalk, driveway approach, solar radar speed feedback signs, pavement, and striping. Anna Chacon - 951-413-3155 annac@moval.org
UPDATES