Access the Full Project by Clicking here!
Bidjugde
JOB
Lakewood Stormwater Runoff Capture Mayfair Park
BID DATE
01/24/18 - 11:30
AGENCY
Lakewood
ESTIMATE
n/a
SCOPE
The work of this Contract includes, but is not limited to, excavation, backfill, channel drop inlet, pretreatment device (30 CFS), one (1) new pump stations (up to 5 CFS), pneumatic gate dam, installation of new pumps, motors, mechanical and storm drain piping, valves, abandoning or removing existing utilities, pressure testing, pavement removal/replacement, underground storage area, water quality skid, building expansion, electrical equipment modifications, instrumentation and controls, planting, irrigation, tennis courts, baseball backstop, and T-ball backstop to support the stormwater and runoff capture system and all other incidental work necessary to construct the project.
PREBID
12/12/2017 9:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT