Access the Full Project by Clicking here!
Bidjugde
JOB
Viewpoint Drive Stormwater Channelization Improvements Spouse to Manley Phase 3
BID DATE
12/18/17 - 3:45 REAL-TIME
AGENCY
Prescott Valley
ESTIMATE
n/a
SCOPE
he Town of Prescott Valley is seeking bids for the construction of the Viewpoint Drive Stormwater Channelization Improvements, Spouse to Manley, Phase 3, CIP # S168.5c. This work consists primarily of excavation of approximately 530 feet of flood control infrastructure within the Viewpoint Drive corridor from downstream of Custer Circle (connecting to existing Phase 2) to upstream of Custer Circle, replacing/realigning three (3) sewer services, installing 364 lf of 6-barrel culverts (2,180 lf total), and replacing 548 sy of disturbed pavement within Custer Circle. Also included is earthwork fill downstream of Manley Drive for a portion of the future Viewpoint Drive. Bill Osborne (928) 759-3083 bosborne@pvaz.net
UPDATES