Access the Full Project by Clicking here!
Bidjugde
JOB
Hagginbottom Storm Drain Pump Station Rehabilitation
BID DATE
12/21/17 - 3:00
AGENCY
Sacramento County
ESTIMATE
$1,330,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for the rehabilitation of the D01 Hagginbottom Storm Drain Pump Station, including, but not limited to, demolishing existing electrical systems, modifying the existing utility service, providing new panelboard and transformer pad, providing new utility metering with main disconnect/ generator disconnect and power distribution system, providing new pump controls that include solid state starters with full voltage bypass contactors, providing a new submersible low flow pump, providing new PLC control panel and backup level control panel, demolishing existing trash rack and replacing with new automated split trash rack, demolishing existing electrical building, constructing new CMU electrical building, providing new actuator to flow through structure, reconnecting existing miscellaneous site loads, demolishing existing gate and fence and installing new gate and fence, regrading and repaving site, and all other work shown in the plans and specifications Michael Cook (916) 874-8546 cookmi@saccounty.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT