Access the Full Project by Clicking here!
Bidjugde
JOB
FE Weymouth Water Treatment Plant West Washwater Tank Seismic
BID DATE
01/9/18 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$2,400,000
SCOPE
The project consists of installation of a new anchorage system and a supplemental concrete ring footing for West Washwater Tank, removal and replacement of existing steel roof, relocation of existing conduits and cables to facilitate the structural work, interior and exterior tank coating, construction of an electrical duct bank, replacement of the existing 42-inch butterfly valve and actuator, asbestos abatement and other appurtenant work as specified and shown on the drawings.
PREBID
12/6/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT