Access the Full Project by Clicking here!
Bidjugde
JOB
(JOC) Roadway Construction Stabilization Paving - 2
BID DATE
11/13/17 - 10:00
AGENCY
MCOPS
ESTIMATE
$1,000,000
SCOPE
FIRMS SUBMITTED: FNF; HAYDON; MARKHAM; RUMMEL; SWP; SUNLAND; CACTUS; DBA; TANNER; VIASUN; BANICKI The project may include but not limited to, supplying all labor, material, and equipment, to provide construction or reconstruction of roadways and/or shoulders, soil stabilization for roadway subgrade and/or shoulders, asphaltic concrete overlays, construction or reconstruction of concrete related items such as concrete structures including headwalls, box culverts. Additionally, work may include the construction of new asphaltic concrete pavement or other designated surfacing material which may also require installation or replacement of drainage pipe culverts, construction of concrete curb & gutter, driveway entrances, sidewalk ramps, and installation of pavement markings. Some work assignments may require utility relocations work, extra coordination efforts, cacti/tree relocation and/or removal, landscaping and irrigation restoration, constructing new fences, relocating or rebuilding fences and other related work. Work assignments may include, but are not limited to pavement widening, shoulder stabilization, infrastructure improvements and construction improvements for low volume roads. shamrockp@mail.maricopa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT