Access the Full Project by Clicking here!
Bidjugde
JOB
LC 50 Repairs Improvements
BID DATE
04/26/18 - 7:00
AGENCY
Department Army
ESTIMATE
$5,000,000
SCOPE
BID DATE WILL BE RELEASED END OF NOV 2017. This project shall consist of site improvements that include, but are not limited to: Constructing a 64 feet diameter concrete pad above a concrete silo and storage tank and lower 64-ft diameter concrete pads. A Rack Room and tunnel system will connect the silo to the existing Control Room. Power for the operational equipment will be provided by a new 208/120V, three phase, 225KVA pad mounted transformer. A water pumping system and HVAC system shall be constructed to serve the silo, Rack Room, and tunnel system. The site shall be excavated, backfilled, and compacted to provide for a berm around the storage tank, access driveway, retaining walls, access tunnel, and other improvements. Prime Contractor Experience Criteria: • Heavy poured in-place concrete construction • Deep excavations Types of work that could represent experience criteria: • Very large sewage treatment plants • Deep underground utility tunnels • Multi-level basement parking structures elmer.howard@usace.army.mil
UPDATES