Access the Full Project by Clicking here!
Bidjugde
JOB
Phase IX Roadway Improvements
BID DATE
12/11/17 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
$3,322,518
SCOPE
This contract shall be for furnishing all labor, materials, transportation, and services for the construction and/or installation of all improvements shown on the Plans, including, but not limited to the following: 1. S. Everton Terrace (S871) – The Project consists of approximately 1,344 feet of two lane, full street surface improvements tying into existing improvements in S. Everton Terrace at STA 23+04.97. Improvements include installation of potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, neighborhood entry monuments, landscaping, and irrigation. 2. S. Eastmark Parkway Phase 1 Only (S872) – The Project consists of approximately 2,050 feet of half street improvements with a landscaped raised median with one lane in each direction tying into existing improvements in E. Point Twenty-Two Blvd. Improvements include installation of sewer, potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, traffic signal conduit, street sleeves, neighborhood entry monuments, landscaping, and irrigation. 3. Traffic Signal at Eastmark Parkway and Point Twenty-Two Blvd (S873) – The Project consists of the installation of a four-way traffic signal at the intersection of Eastmark Parkway and Point Twenty-Two Blvd. For information contact: Maggie Smith, City of Mesa, Maggie.smith@mesaz.gov
UPDATES