Access the Full Project by Clicking here!
Bidjugde
JOB
Post Road Hydro Booster Pump Station
BID DATE
12/7/17 - 10:00
AGENCY
Eastern Municipal WD
ESTIMATE
$3,600,000
SCOPE
Under these Specifications the Contractor shall perform all labor, equipment, and materials necessary for construction of approximately 2,400 feet of 18–inch CML&C transmission pipeline from the intersection of Post Road and Ellis Avenue (location of the existing tank) north to the proposed pump station, and approximately 3,200 feet of 8-inch C-900 PVC transmission pipeline from the intersection of Post Road and Ellis Avenue east to approximately Main Street alignment, including but not limited to water valves, air valves, fire hydrants, blowoffs, and other appurtenances; connecting to existing underground off-site piping, including shutdowns, dewatering, highlines, line stops and hot taps, if required, and required painting and coatings, all testing, disinfection and startup as specified. Pipeline work includes all interconnections, connection to the existing tank near Ellis Avenue, pipeline work to the designated location feeding the future Post Road tank, and all other connections associated with the booster station and other appurtenances identified within the Contract Documents. Potholing of existing utilities is also required for all work associated with this project. Preparation, approval and implementation of traffic control plans; preparation and processing of right-of-way encroachment permits with the County of Riverside and other permits as necessary to perform the work, including approval of a SWPPP will all be required. Additional work includes saw cutting, removal, disposal and grinding of pavement, trench sheeting, shoring and bracing, excavation, backfill, compaction, AC repair and overlay, signing and striping per County of Riverside requirements. Jill Lloyd; EMAIL: paradal@emwd.org & lloydj@emwd.org.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT