Access the Full Project by Clicking here!
Bidjugde
JOB
Mid City Pipeline Phase 2A
BID DATE
12/12/17 - 2:00
AGENCY
San Diego
ESTIMATE
$4,000,000
SCOPE
Mid-City Pipeline Phase 2A will install approximately 820 linear feet of new 66 diameter CML&TC steel transmission main. Within this 820 linear feet is approximately 62 of tunneling under a San Diego County Water Authority aqueduct. The tunneling consists of a minimum 82 diameter steel casing. Two 4 inch diameter fiber optic conduits will be installed with the water pipeline and work also includes SCADA improvements and an insertable flow meter for the Murray 2nd Pipeline, as well as, associated required street ADA improvements and paving. The 66-inch transmission main will run southward down 69th street from the 69th and Mohawk Street Intersection to a point approximately 350 west of 69th street in El Cajon Boulevard. The north terminus of the pipeline will be connected to 69th and Mohawk Pump Station. The south terminus will connect to the Mid-City Pipeline Phase 1 at the San Diego/SDCWA FCF 18/21 on El Cajon Boulevard between 68th Street and 69th Street. Brittany Friedenreich - 619-533-3104 bfriedenreic@sandiego.gov
UPDATES