Water Group 939
BID DATE
12/19/17 - 2:00
AGENCY
San Diego
ESTIMATE
$3,200,000
SCOPE
The project would include approximately 7,045 linear feet (1.33 miles) of water mains to include replacement-in-place of approximately 3,036 linear feet (0.57 miles) of existing 4-inch and 12-inch with 8- and 16-inch water mains and approximately 3,729 linear feet (0.71 miles) of new 8-inch and approximately 279 linear feet (0.05 miles) of new 16-inch water main installed via trenchless method In addition, approximately 5,335 linear feet (1.01 miles) of existing water mains would be abandoned in place. Related work would also include curb ramp installation, potholing, replacement of water service in place at same depth if needed, fire hydrants, street resurfacing, traffic control, and best management practices (BMPs). Antoinette Sanfilippo - 619-533-3439 asanfilippo@sandiego.gov