Access the Full Project by Clicking here!
Bidjugde
JOB
Florence Gardens Phase IV V Paving and Improvements
BID DATE
12/19/17 - 2:00
AGENCY
Florence
ESTIMATE
n/a
SCOPE
This Project takes place in the Florence Gardens community of Florence Arizona. Removal of approximately 48,000 sy of existing asphalt pavement, approximately 6,600 sf of concrete sidewalks, driveways, curb and gutter, valley gutter. New construction of approximately 37,000 square yards of 2.5 and 3 asphalt pavement over potentially varying depths (between 6 to 8) of ABC base course, approximately 100,000 sf of concrete valley gutter (to include driveways, sidewalks and sidewalk transitions as well as curb and gutter). Scarification and recompaction of subgrade may be required, based on the Geotechnical Report provided as part of this ITB. Provide sidewalks, driveways, curb and gutter, valley gutter, and other drainage features per plans. Adjust manholes and valve boxes/covers to grade per plans. Install survey markers per plans. Relocate traffic control signage per plans. Relocate street lights per plans. Refer to Quantities listed on the cover sheet of the plans and the Bid Tab for projected design quantities/items not specifically listed here. susan.jonas@florenceaz.gov
UPDATES