Campus Park ASR Well Pipeline Phase I
BID DATE
11/14/17 - 2:00
AGENCY
Oxnard
ESTIMATE
n/a
SCOPE
Work for the installation of 22-inch HDPE recycled waterline along Fifth Street from Ventura Road to Campus Park. The Work includes the connection to existing 18-inch HDPE at Ventura Road and end connection to ASR well at Campus Park and restoration of asphalt concrete pavement along the pipeline alignment.