Access the Full Project by Clicking here!
Bidjugde
JOB
Lower El Mirage Wash Basin
BID DATE
03/19/13 - 2:00 LIVE!
AGENCY
MCFCD
ESTIMATE
$2,000,000
SCOPE
The existing depression at the southwest corner of the intersection of El Mirage Road and Cactus Road will be improved as a finished detention basin, including landscape improvements. Existing features to be removed include storm drain pipes and inlets, riprap, and clearing and grubbing of existing trees and other volunteer vegetation. New improvements include reshaping of the basin, placement of erosion protection rock mulch, new storm drain pipes, new storm drain outlets, a sediment basin, a concrete pathway throughout the basin, landscape plantings, including large turf areas, irrigation system, and a new 60” pipe culvert outlet crossing El Mirage Road to the east. The successful contractor shall be required to reach Final Completion within 365 consecutive calendar days after the Notice to Proceed. The construction contract amount is estimated between $1,000,000 - $3,000,000.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT