Access the Full Project by Clicking here!
Bidjugde
JOB
2016 2017 2017 2018 Sewer Main Lining Various
BID DATE
11/1/17 - 2:00
AGENCY
Buena Park
ESTIMATE
n/a
SCOPE
The Project includes, without limitation, furnishing all materials, equipment, tools, labor, and incidentals needed to complete the project and doing all work necessary as indicated by the plans, specifications and contract documents, including but not limited to, mobilization, demobilization, construction of a Cured-in-Place Pipe (CIPP) Liner, OR Folded and Re-formed Polyvinyl Chloride (PVC) Pipe Liner (without the use of any open trenches), OR Spiral Wound PVC Pipe Liner, trimming of the liner, pre-and post-CCTV inspection of each line, reopening each service lateral, removal of protruding laterals, sewage bypass, material composition and testing, cleaning, pressure grouting (as needed), removal of existing mineral deposits from water intrusion, calcium removal by High Pressure-Low Volume Precision Water Jet Cutting and all other items to complete the Work in place.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT