Access the Full Project by Clicking here!
Bidjugde
JOB
Crown Valley Parkway Median Improvements Arterial Roadway Resurfacing
BID DATE
11/14/17 - 2:00
AGENCY
Dana Point
ESTIMATE
n/a
SCOPE
The general category/type of work includes, but is not limited to, the following: a. Asphalt repair, rehabilitation and pavement overlay with conventional asphalt of Crown Valley Parkway from Pacific Coast Highway to Camino Del Avion/Pacific Island Drive, and, b. Street and landscape median improvements, as outlined on the Contract Documents. More specific work items included within the general category/type of work listed above include, but are not limited to: mobilization/demobilization; traffic control; community outreach; removal of existing median landscaping; removal and reconstruction of PCC median curbs; installation of new median trees, drought tolerant landscaping and gravel paving; irrigation improvements; pavement removal; subgrade repairs; asphalt pavement repairs; cold-milling existing asphalt; asphalt overlay construction; adjustment of existing utility appurtenances to new grade; signing and striping; implementation of Best Management Practices (BMP) for storm water pollution prevention during all construction activities; and other general improvements as outlined in the Contract Plans and Specifications for the above-stated project. msinacori@danapoint.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT