Rolling Hills Area Street Sewer Water Improvement
BID DATE
11/2/17 - 8:15
AGENCY
Fullerton
ESTIMATE
$3,500,000
SCOPE
Removing and installing 0.5 miles of 8 VCP sewer pipe and related appurtenances; installing 1.6 miles of 8 and 12 PVC and abandoning existing water pipe and related appurtenances; removing and installing concrete structures, including sidewalk, curb and gutter, cross gutter and spandrels, driveways, and access ramps; slurry sealing; cold milling/excavation and installing aggregate base and asphalt concrete; underground vault and pipe rehabilitation; large water meter upgrade; and all related work.