Access the Full Project by Clicking here!
Bidjugde
JOB
Terminal Upper Roadway Joint Seals Sidewalk Crossing
BID DATE
03/30/18 - 10:00
AGENCY
Tucson Airport Authority
ESTIMATE
n/a
SCOPE
The major elements of the work include the following: Removal and replacement of the entire length of both longitudinal and transverse expansion joints at TUS terminal upper roadway. Demolition and removal of concrete at existing access ramp and crossings. Construction of new concrete access ramps and crossings with installation of new cast-in place truncated dome system conforming to ADA standards. sgranillo@flytucson.com
PREBID
10/19/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT