Access the Full Project by Clicking here!
Bidjugde
JOB
Alessandro Blvd Street Improvements Chagall Ct Graham St
BID DATE
11/9/17 - 2:00
AGENCY
Moreno Valley
ESTIMATE
$361,500
SCOPE
This project consists of street improvements at two intersections on Alessandro Blvd in Moreno Valley at Chagall Court and Graham Street. At Chagall Court the improvements include modification of the existing turn pocket and landscaped median with the addition of curbs and minor paving, as well as related signing and striping. At Graham Street improvements include the removal of the eastbound to southbound free right turn lane and removal of existing traffic signal equipment. Two new traffic signal poles and associated conduit will be installed on the northwest and southeast corners. Associated work includes ADA ramp improvements on the southwest corner, signing and striping.The proposed work includes, but is not limited to, the construction of street improvements; pavement removals; grading; excavation of earth and rock; placement and compaction of fill materials; curb; curb and gutter; sidewalk; curb ramps; asphalt concrete paving over base; drainage; traffic signal poles, mast arms, and foundations; pavement markings and traffic striping and markings; electrical conduit; traffic control; landscape; and irrigation. Rene Herbert - 951-413-3155 reneh@moval.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT