Access the Full Project by Clicking here!
Bidjugde
JOB
6 inch Recycled Water Pipelines Norwalk Blvd UTC Aerospace
BID DATE
10/11/17 - 10:00
AGENCY
Central Basin Municipal WD
ESTIMATE
n/a
SCOPE
The Work involves furnishing all labor, equipment and materials necessary to construct new buried 6-inch inside diameter C900 DR18 PVC pipeline. In addition, Contractor is to: 1. Protect existing facilities in place. 2. Maintain recycled water service and pressure to existing customers throughout construction, except for temporary shutdown to connect tie-ins. 3. Provide traffic control as shown on the construction plans and as required by public agency permits. 4. Construct new blow offs, air release and vacuum valves, and appurtenant isolation valves and fittings as shown on the construction plans. 5. Connect new main to existing at one location near the intersection of Florence Avenue and Norwalk Boulevard. 6. Replace paving per City of Norwalk and City of Santa Fe Springs requirements. romang@centralbasin.org jacquek@centralbasin.org
PREBID
10/4/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT