Access the Full Project by Clicking here!
Bidjugde
JOB
Earley Rd I-8 (010-C-(206)A)
BID DATE
12/8/17 - 11:00 LIVE!
AGENCY
ADOT
ESTIMATE
$49,000,000
SCOPE
The proposed project is located in Pinal County on Interstate 10 between Milepost 186.65 and Milepost 208.83, through the city of Casa Grande. The proposed work encompasses widening Interstate 10 between Milepost 196.42 and Milepost 199.34 from four lanes to six lanes including two new bridges over Jimmie Kerr Boulevard and the Union Pacific Railroad. A fiber optic trunkline will be installed between Milepost 186.65 to Milepost 208.83, including armored single-mode fiber optic cable and two node buildings. Other work consists of constructing widened roadway, mill replace asphaltic concrete pavement, concrete barrier, pipe lining, guardrail, granite mulch, landform graphics, signing, pavement marking, directional drilling, and other miscellaneous work.
UPDATES